Uncertainty quantification

The quantification of uncertainties combines a set of models coming from probability theory and from associated statistical tools which permit their construction using observable data.

The probabilistic models commonly used by PHIMECA Engineering are :

  • the random variables which permit to describe the probability distribution of the values taken for a single parameter (ex : the yield point of a steel) ;
  • the multivariate random variable which permits to describe the probability distribution of the values taken by a group of parameters taking into account possible correlations (ex : the wind speeds and direction for a typical site) ;

  • the random processes which permit to define probability distributions on time and space functions (ex : geometric imperfection field).

PHIMECA Cournon

Centre d'affaires du Zénith
34 rue de Sarliève
F-63800 Cournon d'Auvergne
Tél. : (00 33) 4 73 28 93 66
Fax : (00 33) 4 73 28 95 78

PHIMECA Paris

18/20 boulevard de Reuilly
F-75012 Paris
FRANCE
Tél. : (00 33) 1 58 51 18 02

Accueil
Mentions légales

PHIMECA Engineering est une société d’ingénierie spécialisée dans l’évaluation et l’optimisation des performances des produits et des systèmes. Sa vocation est de proposer des solutions en ingénierie robuste et en fiabilité en s’appuyant sur un socle scientifique solide, un esprit d’entreprise et des valeurs morales partagés par tous ses collaborateurs.